cladding tower block

Comprehensive pre-construction planning and resource allocation

We start pre-construction planning by thoroughly reviewing design documentation and conducting a detailed site analysis. This step ensures we understand access constraints, building occupancy, and logistical considerations. All necessary permits and approvals are secured before construction begins. Resource allocation is then carried out where we define roles and responsibilities for our construction team, schedule material procurement, and arrange for necessary equipment. This ensures that labour, materials, and tools are available when needed, avoiding delays and ensuring smooth workflow.

A comprehensive risk assessment then identifies potential hazards, including fire risk. We implement safety measures to mitigate these risks, ensuring compliance with health and safety regulations, including OSHA guidelines and local building codes. We then develop and enforce safety protocols, including PPE requirements, emergency procedures, and site-specific safety training. Regular safety inspections are conducted to identify and rectify potential hazards.

Enquire Now

Rigorous quality control and stakeholder communication

We define quality standards for materials and workmanship, ensuring alignment with design intent and specifications. Inspection and testing procedures are implemented at critical stages to verify compliance and quality. Documentation such as detailed records of inspections, tests, and any deviations from the design are maintained. Corrective actions are documented to ensure transparency and accountability.

Stakeholder communication is a vital step in the process. A communication plan keeps all stakeholders informed about project progress, issues, and updates. Regular coordination meetings with the construction team, architects, and specifiers address challenges and adjust plans as needed. We establish a process for managing changes to the construction plan, including design modifications, scope adjustments, and unforeseen conditions. This ensures flexibility and responsiveness throughout the project.

Discuss your project
Construction team planning meeting
construction workers on site

Effective implementation, monitoring, and handover

The site is prepared for construction, including setting up scaffolding, safety barriers, and temporary facilities. Construction tasks are carried out as per the schedule, adhering to safety protocols, quality standards, and design specifications. Progress is continuously monitored against the construction schedule and adjustments are made as necessary to address delays or issues, ensuring timely completion of each phase.

Final inspections ensure all work meets required standards and specifications and all relevant handover documentation, including as-built drawings, warranties, and maintenance manuals, is compiled and handed over to the building owner or management. This ensures that all aspects of the remediation works are completed to the highest standards, providing peace of mind for building safety and compliance with the Building Safety Act.

Enquire Now

Our Cladding Assessment & Redemption Process:

01

Identification

We conduct thorough surveys to identify potential defects and compliance issues in your building's cladding system.

02

Fire Risk Assessment

Our comprehensive fire risk assessments evaluate the fire safety of your building’s cladding system to identify potential hazards.

03

Report & Recommendation

We consolidate findings from surveys and assessments into a coherent analysis, providing detailed recommendations for remediation.

04

Design & Construction Planning

We develop initial design concepts that address identified issues, select appropriate cladding materials, and begin our pre-construction process.

05

Finishing Strategies

We prepare cladding surfaces, apply suitable primers, and finish with paint, coatings, or other finishes to ensure a consistent appearance.

Frequently Asked Questions

Explore the intricacies of our construction phase plan, ensuring efficient, safe, and high-quality execution of cladding remediation projects.

Enquire Now

Why is pre-construction planning crucial for cladding remediation?

Pre-construction planning involves detailed review of design documents and site analysis to understand logistical constraints and secure necessary permits. It ensures effective resource allocation and implementation of safety measures, crucial for smooth project execution.

How does your construction phase plan ensure safety on-site?

Our plan includes rigorous risk assessment to identify hazards like fire risks. We enforce safety protocols, conduct regular inspections, and provide site-specific training and PPE to mitigate risks and comply with health and safety regulations.

What measures ensure quality control during construction?

We set stringent quality standards for materials and workmanship, conducting inspections and tests at critical stages. Detailed documentation of inspections and any corrective actions ensures transparency and adherence to design specifications.

How do you manage communication with stakeholders throughout the project?

We maintain a robust communication plan to keep stakeholders informed about progress, issues, and changes. Regular coordination meetings ensure alignment with project goals and facilitate prompt resolution of challenges.

What happens during the project handover phase?

During handover, we ensure all construction meets required standards and specifications. Final inspections validate compliance, and comprehensive documentation, including as-built drawings and warranties, is provided to ensure seamless transition and building safety compliance.